How to find the campaign start date ?
-
Hit the settings Tab, shown on the main page - and it drops the column in for the campaign start date.
Does that make sense? Let me know if you struggle finding it.
-
This question made me wonder the same thing, but with both explanations I still can't find it. Any screenshots?
-
Just look for the following in your campaign settings.
-
This might be the reason you are not seeing it:
- Campaign scheduling is available for campaign types with the "All features" campaign sub-type enabled. If you're using a "Standard" campaign sub-type, you'll need to go to your campaign's Settings tab and switch your campaign sub-type to "All features" in order to see scheduling options.
Are you using 'all features' or 'standard' as campaign setting?
Sander
-
Not sure, but I don't see this either. even CTR + F doesn't find me anything. I got the $99 plan, might that be a reason? If you can provide a other screenshot that would be great!
Thanks a lot
-
Woooops, I thought this was about AdWords. Sorry for the confusion! Mmmm I can't find it too. Someone else?
-
Bob, sorry again - I thought Adwords campaign as well.
On Moz - if you go to the time frame in the top corner. Hit the tab down bar, you get the month it started. Closest I can find with a quick look.
-
While the date isn't readily available within the app, you can grab it from the Historic Rankings CSV.
Provided that you entered at least 1 keyword into your campaign during the creation process, the oldest date at the bottom of the Historic Rankings CSV would be your initial campaign creation date

-
Thanks Jordan, That's how I did it as well. But I seem to remember seeing the start date in the campaign settings. Probably my mistake.
-
Sorry for not been clear everyone. I meant the Moz campaigns and the solution is provided by Jordan.